McAree Engineering, Co. Monaghan

DC piling installed 873 nr 275mm square precast piles to depths of 10 meters for a new industrial building for McAree Engineering.

The site is situated on an old lake used as part of the Ulster canal and was overlain with peat and made ground. Over 6500 meters of piles where installed to carry the purpose built 3,700m2 (40,000 square feet) factory unit with 8,000 m2 yard space, adjacent to their current facility which will double their capacity to manufacture their V-MAC range of bulk storage silos.

Two Junttan piling rigs were mobilised to complete this job, a PM16 and a PMx20